Accounting Analytics: An Integrated Approach
Part V of V: Capstone Cases
Chapter 2 of 3 in this Part
Table 18.1 · The contract manufacturer’s quote (a hypothetical exhibit)
| Family | Quoted annual volume (units) | Average price per unit | One-time tooling and qualification | Lead time |
|---|---|---|---|---|
| FUR-BNH Benches | 1,450 | $325 | $18,000 | 8 weeks |
| FUR-NGT Nightstands | 3,200 | $270 | $22,000 | 8 weeks |
| FUR-SDB Sideboards | 3,800 | $325 | $25,000 | 8 weeks |
| FUR-TBL Dining tables | 5,000 | $315 | $30,000 | 8 weeks |
| LGT-SCN Wall sconces | 4,600 | $180 | $15,000 | 6 weeks |
| TXT-PIL Pillow covers | 700 | $220 | $8,000 | 6 weeks |
Table 18.2 · The controller’s planning assumptions
| Assumption | Value |
|---|---|
| Base year | Fiscal 2026 |
| Practical capacity | 80% of the available hours in WorkCenterCalendar |
| Straight-time labor rate and burden | 26.62 an hour; burden 14.14% of pay |
| Hours per standard hour at plan | 1.18, of which 0.18 indirect |
| Plan volume, taken as normal capacity | 68,912.79 standard hours a year |
| Salaried production staff at plan | 263,191.24 a year, before burden |
| Depreciation at plan | 293,499.96 a year |
Table 18.2 · The controller’s planning assumptions
| Assumption | Value |
|---|---|
| Practical hours of one position | 80% × 8 hours × the 2026 working days |
| Severance per position | Eight 40-hour weeks of straight-time pay with burden |
| Materiality screen for the statements | 5% of income before income taxes as recorded |
| Margin floor for pricing | 40% gross margin on time-driven cost, before unused capacity |
| Demand-growth test (optional) | Volume 40% and 50% above 2026 |
Table 18.3 · Tools and files
| Tool | File | Holds | Hand-off |
|---|---|---|---|
| SQL | MakeBuy.sql, run on CharlesRiver_Capstone.sqlite | Family results, the inputs to 1090, activities, capacity | Copy with Headers or Export to CSV, unrounded |
| Excel | Make Buy Reprice.xlsx | Assumptions, cost behavior, costs, make or buy, capacity, prices, standards, documentation | A Table of item costs, one row per item |
| Power BI | Product Costs.pbix | The explorer for the meeting, with a Validation page and a Tests tab | Reads the workbook and CharlesRiver.xlsx |
Which tool fits each step?
Milestone 1: What the records show (Requirements 1 to 3): the family results, the inputs to 1090 with their behavior tests, and the capacity table.
Requirement 1 · Test the CFO’s numbers and the premises behind them (Chapters 9 to 11)
Requirement 2 · Take the overhead apart (Chapters 7, 10, and 11)
Requirement 3 · Measure the activities and the capacity (Chapters 10 and 11)
Milestone 2: What a product costs (Requirements 4 and 5): the three costs for each family, the unused capacity reconciled to 1090, and the explorer.
Requirement 4 · Compute three costs for each family (Chapter 7)
Requirement 5 · Build the explorer for the meeting (Chapters 13 to 15)
Which cost fits each question?
Milestone 3: Make, buy, or reprice (Requirements 6 to 8): the decision for each quoted family, the value of freed capacity, and the price increases.
Requirement 6 · Decide make or buy, family by family (Chapter 7)
Requirement 7 · Value the capacity that buying would free (Chapter 7)
Requirement 8 · Reprice the families below the floor (Chapter 7)
What stops if a family is bought?
Milestone 4: Standards and the memo (Requirements 9 and 10): the revised standard, its effect on the statements, and the memo.
Requirement 9 · Revise the standards, and measure what they mean for the statements (Chapter 9)
Requirement 10 · Write the decision memo
These slides accompany Accounting Analytics: An Integrated Approach, licensed under CC BY-SA 4.0. Every figure and table comes from the chapter:
https://aa.accountinganalyticshub.com/chapters/18-make-buy-or-reprice/chapter.html
Chapter 18 · Make, Buy, or Reprice